STEM Block Time Lapse Video

STEM Block Blog

Keeping you updated on progress.

Really taking shape !

Really taking shape !
The new STEM Block with the Music Centre in the foreground.
Continue reading
104 Hits
0 Comments

Outside East Facing View

Outside East Facing View
Insulation installed.
Continue reading
78 Hits
0 Comments

First Floor and Mezzanine Plant Room

First Floor and Mezzanine Plant Room
Construction continues.
Continue reading
116 Hits
0 Comments

Ground Floor Works

Ground Floor Works
It may be Half Term for most but work continues on the STEM Block !
Continue reading
56 Hits
0 Comments

New Roof Lights !

New Roof Lights !
The STEM Block's new roof lights which will throw natural light into the atrium at the centre of the building. (The School Business Manager went to the top of the new roof with some trepidation to take this).
Continue reading
139 Hits
0 Comments

Work progressing well

Work progressing well
Taking Shape, the majority of the current works are internal but this is a great picture to show the dimensions of the new STEM Block.
Continue reading
84 Hits
0 Comments

All going to plan so far.

All going to plan so far.
Work continues on the site, great view on Friday from the roof line of the STEM Block of the 2nd Floor Plant Room and 1st Floor Classrooms.
Continue reading
216 Hits
0 Comments

The start of roofing works

The start of roofing works
Stunning progress this week with the build. It looks like the construction team will be busy during half term week.
Continue reading
148 Hits
0 Comments

Taking Shape

Taking Shape
Great tour of the site today in advance of a Construction Design Team Meeting. The STEM Block is definitely taking shape. Hopefully fair weather for the remainder of this week will ensure work continues at pace. Looking forward to another tour on the first floor by the end of the week.
Continue reading
193 Hits
0 Comments

Work Continues...

Work Continues...
The second phase of the steel superstructure is being lifted and fixed to the existing Randon Centre structure.
Continue reading
150 Hits
0 Comments

Room with a View

Room with a View

View from the First Floor of the new STEM Block this morning! Picture taken from Physics Lab FF4

Continue reading
200 Hits
0 Comments

BREAKING GROUND !

D71-7324

On Wednesday 16th December Headteacher Mr Dominic Robson assisted the construction team at Manton's on the STEM Block site ably supported by Dr John Craggs DL (Chair of Governors) and also Mr Clive Richards OBE DL who has significantly supported the STEM Block project.

Guests were treated to a tour of the recently demolished interior of the existing Randon Centre by Architect Richard Johnson who shared the project plans with guests before they were led outside to see how the ceremonial ash handled silver spade coped with being put into action.

A tour of the outside area of the site then took place where significant progress has been achieved with a third of the foundations now in place and the first part of the steel structure being erected adjacent to the Clive Richards Music Centre.

Headteacher Dominic Robson then gave an address that underlined his sincere appreciation to all those in the school community who have supported the project financially and highlighted the projects importance in supporting the school's vision of 'Inspiration and Excellence'

Continue reading
279 Hits
0 Comments

Outside on the construction site 20th November 2015

Outside on the construction site 20th November 2015
Ground works by the crib wall. More ground works including ground levelling, excavation and concreting foundations to take place in the next couple of weeks.
Continue reading
187 Hits
0 Comments

Mr Holden's old office is now demolished

Mr Holden's old office is now demolished
The internal demolition of the Randon Centre has been a key feature of the work on site this week.
Continue reading
261 Hits
0 Comments

Don't look Mr Belcher !

Don't look Mr Belcher !

It would seem that the demolition of the old Design & Technology rooms is well underway!

Continue reading
243 Hits
0 Comments

STEM Block Time Lapse Update

Continue reading
228 Hits
0 Comments

Update 4th November 2015

Update 4th November 2015
The crib wall is now erected and basic groundworks around the site continue.
Continue reading
204 Hits
0 Comments

Update Weekending 23/10/15

Excellent News: Construction work has now started !

A fence was erected around the proposed building area on Monday 13th October and our building contractor E Manton Ltd started to set up the site. The trees at the side of the Sports Hall as detailed in the planning application have been removed and there has been groundwork to prepare for the crib wall that will run along the side of the Sports Hall. This will be built during the half term break.

"It is really inspiring to finally see our plans coming to fruition. I know that the new build will have such a positive impact on the quality of provision our school can offer in STEM."
Dominic Robson, Headteacher, October 2015.

Continue reading
196 Hits
0 Comments

Artist's Impression

stem

How the STEM block will look

Continue reading
223 Hits
0 Comments